DOUBLE BARREL 96″ UNDER I-75

Installation of dual 96-inch headwalls beneath I-75 in Broward County. The installation was successfully completed beneath an existing bridge using an innovative construction approach that allowed the bridge to remain fully operational while maintaining its structural integrity throughout the process. Upon completion of the dual-barrel installation, a reinforced concrete headwall was formed and poured at the termination point of the run.